Blog Featured Image
Panchkula 01 Jul 2025 sanya kamra

Fresh Water for Panchkula! Dam Pipeline to Restore 45 MLD Supply by Year-End

Panchkula, a fast-growing city in Haryana, is about to get a big boost to its water supply. After two years of waiting, repairs to the Kaushalya Dam pipeline are finally starting. This means that by the end of the year, Panchkula will get back 45 million litres per day (MLD) of clean water from the dam. This is great news for residents, businesses, and anyone interested in panchkula real estate or panchkula real estate investment. In this blog, we explain what’s happening, why it matters, and how it will help the city grow.

 

Panchkula Water Supply

Panchkula is a planned city with modern homes, offices, and good infrastructure. But for the last two years, many people—especially in the Ghaggar sectors—have faced water shortages. The main reason was damage to the Kaushalya Dam pipeline during heavy rains. The pipeline brings water from the Kaushalya Dam to Panchkula’s water treatment plants.

Now, after a long wait, the repair work has finally been given to a contractor. The work will start after the monsoon and is expected to take four months. This means that by the end of the year, the city should have its full water supply back

 

How Does the Water Get to Panchkula?

Source: Kaushalya Dam, located near Pinjore.

Pipeline: Water travels through a pipeline to Sector 1 and Sector 32 water treatment plants.

Route: The pipeline goes through Beed Ghaggar village.

Supply: Once treated, the water is sent to homes and businesses across Panchkula.

 

Kaushalya Dam Water Project 

The Kaushalya Dam water project is a key part of Panchkula’s water supply. The dam was built to provide drinking water, help control floods, and recharge groundwater. It has a big catchment area and can supply a lot of water for many years.

But for the past two years, the pipeline was damaged, and the city could not get all the water it needed from the dam. This made life difficult for many people, especially in areas where water was already in short supply.

 

What Will Change After the Repair?

More Water: The repaired pipeline will bring back 45 MLD of water to Panchkula.

Less Dependence on Tubewells: Right now, the city gets 97 MLD of water—45 MLD from Kajauli waterworks and the rest from tubewells. The extra water from the dam will help reduce the need for tubewells, which is good for the environment.

Relief for Residents: People in Ghaggar sectors and other areas will have more reliable water supply.

 

Kaushalya Dam Pipeline Repair

The Kaushalya Dam pipeline repair is a big job. The main damage happened near the Amarvati Enclave bridge on the Shimla national highway. Some parts of the pipeline will be repaired, and others will be replaced completely.

The work will start after the monsoon and is expected to finish in four months. The estimated cost is around ₹9 crore. Once the work is done, the pipeline will be stronger and less likely to get damaged in the future.

 

Who Benefits from the Repair?

Residents: More reliable water supply means less worry about shortages.

Businesses: Restaurants, hotels, and offices will have enough water for their needs.

Real Estate: A good water supply makes the city more attractive for buyers and investors.

Blog Section Image

Panchkula Real Estate: Why Water Supply Matters

A reliable water supply is one of the most important things people look for when buying or renting a home. For panchkula real estate, the return of 45 MLD from the Kaushalya Dam is a big plus. It means fewer water problems, happier residents, and a better quality of life.

 

How Does This Affect Real Estate Investment?

More Demand: People are more likely to buy or rent homes in areas with good water supply.

Higher Prices: Properties in areas with reliable water often have higher values.

Better Growth: A city with good infrastructure grows faster and attracts more businesses and jobs.

 

Table: Panchkula Water Supply and Kaushalya Dam Pipeline

 

FeatureDetails
SourceKaushalya Dam (near Pinjore)
Pipeline LengthFrom dam to Sector 1 and Sector 32 water treatment plants
Water Supply45 MLD (after repair)
Current Supply97 MLD (45 MLD from Kajauli, rest from tubewells)
Repair Cost₹9 crore
Repair Timeline4 months (after monsoon)
Main BenefitMore reliable water for residents and businesses

 

Frequently Asked Questions 

Q1: Why is the Kaushalya Dam pipeline important for Panchkula?
The pipeline brings 45 MLD of water from the dam to the city, which is a big part of the water supply for homes and businesses.

Q2: When will the pipeline repair be finished?
The work will start after the monsoon and is expected to take four months, so the city should have its full water supply back by the end of the year1.

Q3: How will the repair help residents?
It will make the water supply more reliable, especially in areas that have had shortages.

Q4: What does this mean for panchkula real estate investment?
A good water supply makes the city more attractive for buyers and investors, which can lead to higher property prices and more growth.

Q5: What is the cost of the pipeline repair?
The estimated cost is around ₹9 crore.

Conclusion

The repair of the Kaushalya Dam pipeline is great news for Panchkula. It means more reliable water for everyone, a better quality of life, and a stronger real estate market. For anyone interested in panchkula real estate investment, this is a sign that the city is moving in the right direction. With good infrastructure and a growing population, Panchkula is set to become an even better place to live, work, and invest.